Snow Lake Waste Water Treatment Plant

Details

Location: Snow Lake, MB
Owner: Town of Snow Lake
Architect: Stantec Consulting
Start date: July 2012
Completion Date: October 2013
Value: $9,000,000

Description

The Snow Lake Waste Water Treatment Plant project consisted of the demolition of the existing structures and re-building the treatment facility in its entirety. The existing foundation has been augmented to accommodate the new, larger building footprint and the existing tankage has been re-worked and retrofitted with new mechanical components. The integration of independent foundations and mechanical equipment provide much of the challenges on this project. The treatment process utilizes the Bio-Wheel™ system: an advanced, high efficiency waste water treatment system where high quality effluent is possible by biodegradation of the organic compounds, nitrification, and denitrification and uptake of excess without using chemicals.  

Blumenort Office

25 Penner Drive
Blumenort, MB R0A 0C0
Phone: 204-326-1341
Toll Free: 866-326-1341

Winnipeg Office

Unit 6, 1333 Niakwa Rd East
Winnipeg, MB

Phone: 204-326-1341
Toll Free: 866-326-1341