Skip to main content

Headingley Waste Water Treatment Plant

Details

Location: Headingley, Manitoba
Owner: RM of Headingley
Architect: Stantec Consulting
Start Date: October 2009
Completion Date: September 2010
Value: 12,000,000

Description

This design-build project consisted of the complete design, construction and short-term operation of a new wastewater treatment facility. This facility treats the sewage from the RM of Headingley, Headingley Correctional Institute and the future Women's Correctional Centre. The tight schedule on this project created significant challenges including design completion, shop drawing and equipment delivery and predominantly winter construction. This Sequencing Batch Reactor system consisted of a sulfide-stripping tank, two 3.1 million liter concrete SBR tanks, two aerobic digester tanks and one equalization tank. Housed in the pre-engineered steel building is the treatment equipment, office space, chemical storage and sludge storage.

Blumenort Office

25 Penner Drive
Blumenort, MB R0A 0C0
Phone: 204-326-1341
Toll Free: 866-326-1341

Winnipeg Office

Unit 6, 1333 Niakwa Rd East
Winnipeg, MB

Phone: 204-326-1341
Toll Free: 866-326-1341