Estimating

  • Seine River New Standpipe

    Closing Date: 09/01/2024 2:00 pm

    Job Description/Scope

    New standpipe storage tank (above ground water storage tank) designed and installed by Greatario as a sub-contractor to the General Contractor. New utility building including below grade valve chamber and aluminum prefab stair and railings, instrumentation, recirc pumps, water service and new chlorine feed system. Decommissioning and disposal of the existing standpipe and its concrete foundation including regrading, soil and hydroseed after commissioning and performance testing of new system is complete and accepted. Replace submersible pumps for the WTP raw water pumping station and two new variable frequency drives.

    Estimator

    Jeff Doerksen
    e: jeffd@penn-co.com
    t: 204.326.1341 x221

    View the Plans, Specs and Addenda
  • Thompson Aquatic Centre

    Closing Date: 12/01/2024 2:00 pm

    Job Description/Scope

    Construction of a new 21,388sf new public swimming pool with water slide.
    The Building: The foundation is a combination of steel piles and cast-in-place concrete piles. The structure is structural steel, OWSJ and steel deck. The exterior walls are steel studs with metal panels. The interior walls are block wall and steel studs. The roof is mod bit on steel deck. There is a basement for the mechanical works and a crawl space everywhere there isn’t basement or pool. Also includes site works.

    Estimator

    Jeff Doerksen
    e: jeffd@penn-co.com
    t: 204.326.1341 x221

    View the Plans, Specs and Addenda