Skip to main content

Niverville Water Treatment Plant

Details

Location: Niverville, Manitoba
Owner: Municipality of Niverville
Architect: Genivar
Start Date: June 2010
Completion Date: October 2010
Value: 900,000

Description

Niverville WTP upgrade consisted of adding on a 1.2 million-litre reservoir expansion and tying into the existing reservoir and water treatment plant. The site was extremely small with residential homes next to the site and so shoring was required to separate the residential yards from the jobsite. The reservoir is slightly above the ground with a finished rooftop appearance complete with curbing surrounding the perimeter and the yard beautifully landscaped to allow it to fit in with the residential buildings around it.

Blumenort Office

25 Penner Drive
Blumenort, MB R0A 0C0
Phone: 204-326-1341
Toll Free: 866-326-1341

Winnipeg Office

Unit 6 – 1333 Niakwa Road East
Winnipeg, MB

Phone: 204-326-1341
Toll Free: 866-326-1341